GC Works Inc. Environmental Construction

DA – Payne Lake Dam Spillway Design Build Revitalization

Provided design, survey, site supervision, Quality control, materials, equipment, labor, and logistics for the reconstruction of the Payne Lake Dam Spillway.

FHWA – Black Bayou Lake National Wildlife Refuge in Ouachita Parish, Louisiana

Replacement of the Wildlife Pier Boardwalk, the Nature Trail Boardwalk North and South and the Photo Blind Boardwalk.

USDA – Daniel Boone National Forest Wildcat Branch Abandoned Mine Site

Removed the Low Water Crossing Structure, design and constructed new water crossing and pond, cleared & grubed, embankment, rip-pap, culvert and establishment of turf.

USDA – Talladega National Forest – Construct Culvert

Remove existing water crossing, designed and constructed culvert, installed guardrail, rip-rap and signage.

FWHA – Everglades National Park
Canoe Launch Oyster Bay Lane

The Gulf Coast Visitor Center in Everglades National Park recieved an articulated block ramp and rip-rap for launching canoes.

US National Park Service – Biscayne National Park
Convoy Point Maintenance Building

Renovation of the second floor in the maintenance building which included HVAC, lighting, dry wall, painting, installaition of roll up door and securitty partitions.