GC Works Inc. Government Construction Projects
Sandia Metal Buildings
Provided Two Metal Storage Buildings with 40′ wide x 60′ long and 24′-6 inch peak.
BEP – WCF Offset/LEPE Roof Replacement
Provided Site Supervision, Quality Control, Safety Health Supervision, materials, labor, equipment and logistics to remove and replace 123,046sq ft of roof. Provided Interior Protection, installed new ramps, stairs, walk pads, lightning protection, and interior protection
BEP – WCF Warehouse Roof Replacement
Provided Site Supervision, Quality Control, Safety Health Supervision, materials, labor, equipment and logistics to remove and replace 56,322sq ft of roof. installed new ramps, walk pads, metal decking, flashing, gutters, downspouts, and lightning protection.
DA – Payne Lake Dam Spillway Design Build Revitalization
Provided A&E Design, Survey, Site Supervision, Quality Control, Safety Health Supervision, materials, labor, equipment and logistics to remove and replace sluice gate and operations tower. A& E work included complete set of construction drawings, specifications, and A&E inspections. Construction included demolition and disposal of the existing operation tower and gate, new tower and sluice gate, including new pilings, decking, railing, stairs, assembly and installation of new sluice gate, and operation training. Provided Site Supervision, Quality Control, Safety Health Supervision, materials, labor, equipment and logistics to remove and replace 123,046sq ft of roof. Provided Interior Protection, installed new ramps, stairs, walk pads, lightning protection, and interior protection
Six Rivers Forest Mad River Ranger Dist.
Provided A&E Design and Inspection, Survey, Site Supervision, Quality Control, Safety Health Supervision, materials, labor, equipment and logistics to construct new remote Ranger Station. Construction included site preparation, footings, structure, electric, mechanical, plumbing, roof, and weather protection.